|

WATER FEES AND CHARGES
Readiness to Serve Charge Effective: May 1, 2005
5/8” – 3/4” meter 1” meter 1-1/2” meter 2” meter 3” meter 4" meter 6” meter 8” meter 10" meter 12" meter 6” weir 9” weir 10” weir 12” weir 24” weir 30" weir |
Monthly Fee
$ 10.00 $ 20.00 $ 40.00 $ 60.00 $ 120.00 $ 150.00 $ 250.00 $ 400.00 $1000.00 $1500.00 $ 11.00 $ 11.00 $ 20.00 $ 20.00 $ 35.00 $ 60.00 |
Commodity Charge hcf = per 100 cubic feet in volume which is equal to 748.05 gallons Effective: May 1, 2005
Up to full entitlement From 1x to 2x entitlement From 2x to 3x entitlement Over 3x entitlement From 4x to 5x entitlement From 5x to 6x entitlement Over 6x entitlement |
Fee per hcf
$ .40 $ 1.00 $ 1.00 $ 1.00 $ 1.00 $ 1.00 $ 1.00 |
Miscellaneous Charges Broken/Missing Lock Meter Testing On-site (Consumer requested) Meter Testing Off-site (Consumer requested) Returned Check (NSF) Late Payment Fee Service Re-establishment Fee (if payment is received after deadline) Service Re-establishment Fee (after 3 p.m.) Stock Transfer New Development Plan Check Construction Permit & Inspection Quit Claim [Easements] Jumper w/Back Flow Valve Water Hydrants Construction Hydrant Meter Application/Permit Hydrant Meter Deposit Hydrant Meter Monthly Fee
Capital Facilities Connection Effective May 1, 2005 5/8” – 3/4” meter 1” meter 1-1/2” meter 2” meter 3” meter 4” meter 6" meter 8" meter 10" meter 12" meter |
Fee $ 25.00 $ 38.00 (refundable if meter is faulty) Actual Cost (refundable if meter is faulty) $ 15.00 $ 5.00 per final notice $ 38.00
$ 56.00 $ 16.00 2½ % of estmtd wtr system construction cost 4½ % of apprvd wtr system construction cost $ 100.00/acre or fraction thereof $ 100.00/month
Actual Cost $ 25.00 $ 850.00 (refundable if returned in same condition) $ 50.00
$ 3,250.00 $ 5,525.00 $ 10,725.00 $ 17,225.00 $ 32,500.00 $ 54,275.00 $ 135,525.00 $ 195,000.00 $ 314,257.00 $ 465,725.00 |
Meters – Installation of New or Upgrade
SIZE
5/8” – 3/4” 1” 1-1/2” 2” 3” 4” |
METER & BOX
$ 185.00 $ 260.00 $ 390.00 $ 600.00 $ 1,200.00 $ 2,000.00 |
SVC. LATERAL
$ 1,680.00 $ 1,680.00 $ 1,760.00 $ 1,870.00 $ 2,200.00 $ 2,900.00 |
TOTAL for BOTH
$ 1,865.00 $ 1,940.00 $ 2,150.00 $ 2,470.00 $ 3,400.00 $ 4,900.00 | Upgrade from a 5/8” meter to a 1” meter = $245.00. Capital Connection Fee Variance for 5/8" to 1" is $2275.00. Note: Please refer to the Capital Facilities Connection fees to determine the variance in the requested upgrade for meter size 1" and above.
|
|