Skip to main content

Fees and Charges

Readiness to Serve Charge

Meter Size Monthly Fee
5/8" - 3/4" meter $10.00
1" meter $20.00
1-1/2" meter $40.00
2" meter $60.00
3" meter $120.00
4" meter $150.00
6" meter $250.00
8" meter $400.00
10" meter $1,000.00
12" meter $1,500.00
6" weir $11.00
9" weir $11.00
10" weir $20.00
12" weir $20.00
24" weir $35.00
30" weir $60.00

Water availability charge - Effective 7/1/2017 - $8.00 per month per full share, which will be charged to all shareholders.

Commodity Charge

hcf = per 100 cubic feet in volume which is equal to 748.05 gallons - Effective 7/1/2017

Usage Amount Fee per HCF
Tier 1 - Up to full entitlement $.68
Tier 2 - usage up to twice the entitlement (supplemental) $1.78
Tier 3 - excess usage over double the entitlement $3.78

 Miscellaneous Charges

Item Fee
Meter Tampering Fee (First Violation) $30.00 + cost
Meter Tampering Fee (2nd violation) $50.00 + cost
Meter Tampering Fee (3rd violation) Legal Action
Meter Testing On-Site (consumer requested) $70.00 (ref. if meter is faulty)
Meter Testing Off-Site (consumer requested) Actual cost (ref. if meter is faulty)
Returned check (NSF/Closed account) $25.00
Late Payment Fee $5.00 per final notice
Service Re-establishment Fee (before 3 p.m.) $40.00
Service Re-establishment Fee (after 3 p.m.) $80.00
Stock Transfer (w/original stock certificate) $30.00 (per stock generated)
Stock Transfer Fee (w/Lost Instrument Bond) $60.00
Stock Transfer Fee (w/Affidavit & Indemnity) At cost
Returned Stock Monthly Storage Fee $10.00/month
New Development Plan Check 3 % of estmtd wtr system const. cost
Construction Permit & Inspection 5 % of apprvd wtr system const. cost
Quit Claim ( Easements) $1500.00 min.- + add'l cost
Jumper w/backflow valve $100.00/month

Water Hydrants

Construction Actual Cost
Hydrant Meter Application/Permit $50.00
Hydrant Meter Deposit $850.00 (refundable when returned)
Hydrant Meter Monthly Fee $65.00

Capital Facilities Connection

Size Meter & Box SVC. Lateral Total for Both
5/8" - 3/4" $584.00 $2,579.00 $3,163.00
1" $677.00 $2,579.00 $3,256.00
1-1/2" $1,089.00 $2,792.00 $3,881.00
2" $1,308.00 estimate $1,308.00 + est.
3" eliminated eliminated eliminated
4" eliminated eliminated eliminated

Upgrade from 5/8" meter to a 1" meter will be estimated.  Capital Connection Fee variance for 5/8" to 1" is $2,341.00.  Note:  Please refer to Capital Facilities Connection Fees to determine the variance in the requested upgrade for meter size 1" and above.