WATER FEES AND CHARGES



 

Readiness to Serve Charge
Effective:  May 1, 2005

5/8” – 3/4” meter
1” meter
1-1/2” meter
2” meter 
3” meter
4" meter
6” meter
8” meter
10" meter
12" meter
6” weir
9” weir
10” weir
12” weir
24” weir
30" weir
Monthly Fee


$ 10.00
$ 20.00
$ 40.00
$ 60.00
$ 120.00
$ 150.00
$ 250.00
$ 400.00
$1000.00
$1500.00
$ 11.00
$ 11.00
$ 20.00
$ 20.00
$ 35.00
$ 60.00
Commodity Charge
hcf = per 100 cubic feet in volume
which is equal to 748.05 gallons
Effective:  July 1, 2009

Up to full entitlement
From 1x to 2x entitlement
From 2x to 3x entitlement
Over 3x entitlement
From 4x to 5x entitlement
From 5x to 6x entitlement
Over  6x entitlement
Fee per hcf




$    .42
$  1.07
$  1.07
$  1.07
$  1.07
$  1.07
$  1.07


Miscellaneous Charges
Broken/Missing Lock 
Meter Testing On-site (Consumer requested)
Meter Testing Off-site (Consumer requested)
Returned Check (NSF)
Late Payment Fee
Service Re-establishment Fee
(if payment is received after deadline)
Service Re-establishment Fee (after 3 p.m.)
Stock Transfer
New Development Plan Check
Construction Permit & Inspection
Quit Claim [Easements]     
Jumper w/Back Flow Valve
Water Hydrants
Construction
Hydrant Meter Application/Permit
Hydrant Meter Deposit
Hydrant Meter Monthly Fee

Capital Facilities Connection
Effective May 1, 2005
5/8” – 3/4” meter
1” meter
1-1/2” meter
2” meter
3” meter
4” meter
6" meter
8" meter
10" meter
12" meter
Fee
$  25.00
$  38.00 (refundable if meter is faulty)
Actual Cost (refundable if meter is faulty)
$ 15.00
$ 5.00 per final notice
$ 38.00

$ 56.00
$ 16.00
2½ % of estmtd wtr system construction cost
4½ % of apprvd wtr system construction cost
$ 100.00/acre or fraction thereof
$ 100.00/month

Actual Cost
$ 25.00
$ 850.00 (refundable if returned in same condition)
$ 50.00



$   3,250.00
$   5,525.00
$  10,725.00
$  17,225.00
$  32,500.00
$  54,275.00
$ 135,525.00
$ 195,000.00
$ 314,257.00
$ 465,725.00


Meters – Installation of New or Upgrade

SIZE

5/8” – 3/4”
1”
1-1/2” 
2”
3”
4”
METER & BOX

$ 185.00
$ 260.00
$ 390.00
$ 600.00
$ 1,200.00
$ 2,000.00
SVC. LATERAL

$ 1,680.00
$ 1,680.00
$ 1,760.00
$ 1,870.00
$ 2,200.00
$ 2,900.00

TOTAL for BOTH

$ 1,865.00
$ 1,940.00
$ 2,150.00
$ 2,470.00
$ 3,400.00
$ 4,900.00

Upgrade from a 5/8” meter to a 1” meter = $245.00.  Capital Connection Fee Variance for 5/8" to 1" is $2275.00. Note: Please refer to the Capital Facilities Connection fees to determine the variance in the requested upgrade for meter size 1" and above.